Shenzhen Gymnasium

CreateDate:2016-10-26  Hits:

There Are More Than 3,500 Or More Points In The Whole System, The System Uses A Standard Cabinets, Modular Structure. The Main Building Adopts Indoor 6 Cores MM OM Fiber And CAT6 UTP Cable. Horizontal Subsystem Chooses CAT6 UTP Products, Writing Room Uses CAT 24 Module Distribution Frame. And There Are Sufficient For Broadband Network Systems Interface. When Completed, Lasun Comprehensive Network System With High Speed And High Bandwidth Transmission Capacity Will Provide A High Standard Of Information Channel. Lasun Will Give A More A Beautiful Rainbow To Stadium .

[ Return ]